rus   eng

The current state of the construction works 01.04.2016

  • Reinforcing of walls
  • Hydra and thermal insulation of the bases
  • Waterproofing of the bases of a framework
  • Installation of a timbering of the base of a framework
  • Installation of a timbering of the bases
  • Installation of a timbering
  • Warming of a monolithic pit
  • Warming of the bases of a framework
  • Warming of the bases
  • Installation of columns of a framework
2
3 4
5 6
7 8
9 10