The current state of the construction works 01.04.2016
- Reinforcing of walls
- Hydra and thermal insulation of the bases
- Waterproofing of the bases of a framework
- Installation of a timbering of the base of a framework
- Installation of a timbering of the bases
- Installation of a timbering
- Warming of a monolithic pit
- Warming of the bases of a framework
- Warming of the bases
- Installation of columns of a framework
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |









